LEXUS RX 300

1998 - 2003 of launch

Repair and operation of the car



Lexus RX 300
+ Lexus RX-300 cars
+ Administrations and methods of operation
+ Placing and regular maintenance of the car
+ Motor
- Cooling systems of the motor, heating, ventilation and air conditioning
   - System of cooling of motor
      Information general and measured by precaution
      Removal, check and installation of the water bomb
      Removal, check and installation of the thermostat
      Check of component ones of the system of cooling
      Removal and installation of an electric heater and supporters
   + Systems of heating, ventilation and air conditioning
+ A system of provision of power and production of the carried out gases
+ Systems of electric equipment of the motor
+ Automatic exchange and differential interaxal
+ Transmission line
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment
+ Schematic diagrams of electric connections

8ca8824c

Check of component ones of the system of cooling

Check of a covering of an electric heater

 ORDER OF REALIZATION

  1. Install the prover of special bomb in an electric heater covering and, when hail is maintaining it in a not less 30th angle. to the horizon, create the constant pressure, doing one pressing in not less, of what 3 seconds. One secure what over the vacuum valve there passes the air, otherwise substitute a covering of electric heater.
  1. Below the same conditions they create the pressure of 0,9 ÷ 1.2 atm – the security valve has to open. If the valve does not open even in a pressure of 0.75 atm, substitute a covering of electric heater.

Check holes

 ORDER OF REALIZATION

  1. Fill an electric heater of the cooling of liquid and install the prover of bomb in his mouth. Heat the motor up to the work temperature, create the pressure of 1.2 atm through the bomb and it is secured what does not fall. Otherwise check hoses of system of cooling, an electric heater and the water bomb of the existence of holes. If the extern holes are not, check the conductor of heat of heater, the block and a head of cylinders. Remove holes.

Supporters' check

 ORDER OF REALIZATION

  1. The motor begins and the 98th hail is secured of the supporters' connection in the moment of the realization of OZh of the temperature. Otherwise 1 D/V substitutes the ECT n °.
  1. The separate captures of the supporters' electrical system, give in them the tension of the battery and join them ampermeters. make sure of the smoothness of the supporters' rotation and compare indications of ampermeters to demands of Specifications of the Head of the system of Cooling of the motor, heating, ventilation and air conditioning.

Check of ECT D/V

 ORDER OF REALIZATION

  1. Empty the system of cooling and the ECT n withdraws ° 2 and n ° 1 D/V.
Position of ECT n ° 1 D/V.
Position of ECT n ° 2 D/V.
  1. Through an ohmmeter they secure the available condutividade between sensors contacts n ° 1 and n ° in a temperature above respectively 98 or 94 I granulate 2. In a temperature there is 88 or 83 I granulate down. respectively for the condutividade n ° 2 and n ° 1 D/V between his contacts has to be going away.
Measurement of resistance of ECT n ° 1 D/V.
Measurement of resistance of ECT n ° 2 D/V.
  1. In unsatisfactory checks results they substitute defective D/V.
  2. Establish D/V, fill the system of cooling of the motor and one secures of the lack of holes.

Check of the supporters' alternation

 ORDER OF REALIZATION

  1. Take of the block of alternation in a compartment of reason of the alternation n ° 1, n ° 2 and n ° 3 of supporters (to see the electric equipment of Front Side).
  2. Through an ohmmeter they secure the available condutividade between contacts 3 and 5 each one re-transmits, and also of the lack of the condutividade between contacts of 1 and 2 each one re-transmits. Besides, the condutividade will be between contacts of 2 and 4 alternations n ° 2.
Contacts of the alternation n ° 1 and n ° 3 of supporters.
Contacts of the alternation n ° 2 of supporters.
  1. 3 applies the tension of battery to contacts (+) and 5 (-) of each alternation (in series) and one secure the available condutividade between contacts of 1 and 2 each one re-transmits. Besides, below these conditions the condutividade has of 2 is going away between contacts of 2 and 4 alternations n °.
  2. If the checks produced unsatisfactory results, substitute defective alternations.