LEXUS RX 300

1998 - 2003 of launch

Repair and operation of the car



Lexus RX 300
+ Lexus RX-300 cars
+ Administrations and methods of operation
+ Placing and regular maintenance of the car
+ Motor
+ Cooling systems of the motor, heating, ventilation and air conditioning
+ A system of provision of power and production of the carried out gases
+ Systems of electric equipment of the motor
- Automatic exchange and differential interaxal
   General information
   Inquiry of bad functioning - the general information
   Sensors substitution
   Removal and installation of meeting of in valves
   Checks and agreements of in
   Removal and installation of a fridge of ATF
   Removal and installation of meeting of the lever of the selector of IN ways
   Removal and DURING installation
+ Transmission line
+ Brakes system
+ Support of the triangular form of interruption and direction
+ Body
+ Electric side equipment
+ Schematic diagrams of electric connections

8ca8824c

Checks and agreements of in

Way checks

There is necessary the 80th hail executes inspections of way in a temperature of ATF of 50 ÷.

Check of the way D

 ORDER OF REALIZATION

  1. Transfer it in the selector's LEVER to the situation "D" and completely hold tight out the pedal of gas pedal.
  2. Compare speeds of dislocation of gear with 1 in O/D the demands of Specifications of the Front automatic Exchange and differential interaxal.

The conditions of the prohibition of taking notice of the transfer of O/D: I granulate temperature of no OZh more 60th., the difference of speed of the car with the established speed of a tempostat does 10 km/h; transfer of O/D that blockades conditions of prohibition: the most 60th union pedal, temperature of no OZh hail corsets itself out.

  1. One secures of the lack of exceptional noise and vibrations in the moment of the movement in the way D blocked or in the transfer of O/D.
  2. One secures of the lack of pushes and slippings using kickdown the function.
  3. Moving
  4. for the way D in the transfer of O/D with an invariable speed (blockading) 60 km/h, lightly hold tight the pedal of gas pedal and check what the turns of the motor do not modify agudamente. The perceptible jump of turns of the motor indicates the bad functioning of the blockade.

Check of 2 way

 ORDER OF REALIZATION

  1. Transfer it in the selector's LEVER to the situation "2" and completely hold tight out the pedal of gas pedal.
  2. Compare the speed that calls with 1 in the 2nd transfer demands of Specifications of the Front automatic Exchange and differential interaxal.

To take notice of the transfer of O/D does not supply with in 2 way.

  1. Check the frenagem for the motor, when way launched the pedal of gas pedal in the moment of the movement in 2 in the 2nd transfer.
  2. One secures of the lack of the exceptional noise in acceleration and delay, and also of the lack of pushes in the moment of the dislocation of gear.

Check of the way L

 ORDER OF REALIZATION

  1. Transfer it in the selector's LEVER to the situation "L" and completely hold tight out the pedal of gas pedal.
  2. It is secured what in does not take notice of the 2nd transfer.
  3. Check the frenagem for the motor, having launched the pedal of gas pedal in the moment of the movement in the way L.
  4. One secures of the lack of the exceptional noise in acceleration and delay.

Check of R and ways P

 ORDER OF REALIZATION

  1. Transfer it in the selector's LEVER to the situation "L" and completely hold tight out the pedal of gas pedal. One secures - slippings available.

Before this check of check that on the car there were no persons and the obstacles.

  1. Hail gives birth to the car in a more 5th slant. and after calling for the way P they launch the brake of parking. One secures of a car immovability.

Checks and agreements of commutation of the ways

Check and adjust of commutation sketch of IN ways

 ORDER OF REALIZATION

  1. To insert of the lever of the selector of IN ways of the situation "N" in another provisions commutation has to be executed lisamente, and indicative of the chosen way it will coincide with the relevant provision of the lever. It if do not take place, to adjust the walk of the choice of IN ways as it is described down.
  1. Give a nut of the fixation of the sketch of the commutation of IN ways and carefully spread the sketch out behind.
  1. Establish etiquettes in the lever of the sketch of the commutation of IN ways in the situation "N".
  1. Install the lever of the selector of IN ways in the situation "N" and property that lightly leaned to the situation "R", hold tight a nut with the effort of 13 nanômetros.
  2. The motor begins and it is secured what the car advances in the choice of the way D and behind – in the choice of the way R.

Situation agreement "P" / "N"

 ORDER OF REALIZATION

  1. Weaken pins of the fixation of the sensor of the situation "P" / "N" and transfer the selector's lever to the situation "N".
  1. A groove is level with the line of a neutral one.

Situation agreement "P" / "N"

1 - the Line of a neutral one
2 - the Pin
3 - the Groove
  1. Maintaining D/V in this situation, hold tight pins of his fixation with the effort of 5,4 nanômetros.

Commutation of check of blockade

The component ones of the management of exchanging the blockade

1 - D/V of lights of the brake
2 - In the valve of blockade of the key of ignition
3 - Meeting of the module of blockade of commutation

 ORDER OF REALIZATION

  1. The measure tension between contacts of the module of the blockade of the commutation and it compares the values received with the table.

Do not separate the capture of electrical system.


  1. There separates the capture Ý/m the valve of the blockade of the key of ignition and measure the resistance between his contacts. If the measured value is not in the variety of 12,5 16,5 ohms ÷, substitute Ý/m the valve.
  1. Apply to contacts Ý/m the valve of the blockade of the tension of key of ignition of the battery and the available noise of the valve is secured. Otherwise substitute Ý/m the valve.

Other checks

So called "test of the Cowshed", the check of the time of a delay of the commutation and the check of the pressure in IN hydraulic lines belong to other checks of in. The data to carry out controls are supplied in Specifications of the Front automatic Exchange and differential interaxal.

Contacts

Check conditions

Tension, in

1 <-> 3 (IT COUNTS <—> E)

The ignition key in the provision of "COUNT"

10 ÷ 14

5 <-> 3 (IG <—> E)

The ignition key in the provision of "in"

10 ÷ 14

2 <-> 3 (STP <—> E)

The pedal of a brake corsets itself out

10 ÷ 14

4 <-> 3 (KLS + <—> E)

The ignition key in the provision "of the COUNT", chooses the "P" in the WAY

0

The ignition key in the provision of "COUNT", IN in the way other of which "P"

7.5 ÷ 11

The ignition key in the provision of "COUNT", IN in the way other of which "P" (for 1 c)

6 ÷ 9.5