LEXUS RX 300

1998 - 2003 of launch

Repair and operation of the car



Lexus RX 300
+ Lexus RX-300 cars
+ Administrations and methods of operation
+ Placing and regular maintenance of the car
+ Motor
+ Cooling systems of the motor, heating, ventilation and air conditioning
+ A system of provision of power and production of the carried out gases
+ Systems of electric equipment of the motor
+ Automatic exchange and differential interaxal
+ Transmission line
+ Brakes system
- Support of the triangular form of interruption and direction
   General information
   + Dispatch the support of the triangular form of interruption
   + Support of the triangular form of subsequent interruption
   - Direction
      Checks of component ones of direction
      Removal, installation, desmontagem and meeting of a column of direction
      Removal and installation of the bomb GUR and his belt of driving
      Removal, installation, desmontagem and meeting of the mechanism of direction
   + Geometry of support of the triangular form of interruption
+ Body
+ Electric side equipment
+ Schematic diagrams of electric connections

8ca8824c

Removal and installation of the bomb GUR and his belt of driving

Component of installation of the bomb GUR

1 - the Driving belt
2 - the Capture
3 - the Sensor of pressure liquid GUR
4 - the Delivery tube
5 - the Nipple pin

6 - Placing
7 - the Repayable hose
8 - the Armband
9 - Meeting of the bomb GUR

Meeting of the bomb GUR

1 - the Pressure they head the union
2 - the Fighter ring
3 - the Valve of management of a liquid current GUR
4 - the union of Infiltration
5 - Pruzhina
6 - Placing
7 - subsequent section of the case
8 - the subsequent arm
9 - Advanced section of the case
10 - the Advanced arm

11 - a bomb Pulley
12 - a bomb End
13 - the Lock ring
14 - Epiploon
15 - a bomb Rotor
16 - they pump Plates (shiber)
17 - the Pin
18 - the Strange ring
19 - the Side torture
20 - the Undulating lavador


 ORDER OF REALIZATION

  1. Withdraw a collar and desconecte a repayable hose, trying not to spill the liquid GUR in a driving belt.
  2. Separate the capture and withdraw the sensor of pressure liquid GUR of a pin of nipple.

Do not leave the sensor from that time otherwise it must be substituted.

  1. Withdraw a pin of nipple with the placing and desconecte a delivery tube.
  1. Through the special adaptation they give two pins and take away a belt of driving.
  1. Weaken a pin of "A" so that it was possible to withdraw the meeting of the bomb. Then completely a pin results of "B" and withdraw the meeting of the bomb.

The pin cannot be poured "A".

  1. In the necessity of the repair of the bomb his desmontagem does to herself according to the illustration the Meeting of the Bomb GUR.
  2. The installation of the bomb is done upside-down. Pay attention till the next moments:
    • Adjust a tension of a belt of driving of the bomb, soon a pin insists on the beginning of "A", and soon a pin of "B" with the necessary efforts;
    • Use the new placing of a tube of delivery;
    • One secures that the cork (of 1) of a delivery tube (2) subjects a support of triangular form;
    • In the conclusion they pump on the air of the system GUR.