Lexus RX 300 + Lexus RX-300 cars + Administrations and methods of operation + Placing and regular maintenance of the car - Motor General information and preparatory operations Check of pressure of compression Check of the motor through the vacuum measure Reduction of the piston of the first cylinder in the provision of the superior dead point (TDP) Check of a corner of an advancement of ignition Removal, check and installation of a belt of GRM drive of his natyazhitel, pulley and cog-wheel of an end of inclination, cog-wheels of axles and intermediary rolls Removal, desmontagem, checks, meeting and installation of a head of cylinders and his component Removal and installation of the motor, check of support Cylinder block Check of D/V of pressure of oil of reason Removal, desmontagem, checks, meeting and installation of the bomb of oil and trundle bed of a case + Cooling systems of the motor, heating, ventilation and air conditioning + A system of provision of power and production of the carried out gases + Systems of electric equipment of the motor + Automatic exchange and differential interaxal + Transmission line + Brakes system + Support of the triangular form of interruption and direction + Body + Electric side equipment + Schematic diagrams of electric connections
|
Removal, desmontagem, checks, meeting and installation of a head of cylinders and his component Removal
Component of installation of the air distributor and oil pipeline of entry
|
- Withdraw the meeting of the air distributor. With this finality carry out the next operations:
- Desconecte the next threads and the captures of the electrical system:
- Thread of the walk of a valve of butterfly;
- Capture and armbands of the sensor TPS;
- Taken of valve of IAC;
- When 1 was taken of VSV n ° and n ° 2 of the system ACIS;
- System of EVAP been overcome with VSV.
- It turns out to be three pins and desconecte a tube of head of pressure of GUR of the air distributor, his torture and a hook that 1 of the motor is lifted n °.
- Separate the next connections:
- PCV waters with hose of the valve PCV in a head of the right number of cylinders (1);
- Thread of weight and the basic tire of the valve of management of air provision of the ACIS (2) system;
- Thread Weight of the air distributor (3);
- Hose of vacuum of the amplifier of brakes of the air distributor (4);
- Two hoses perepuskny of the system of cooling of the case of a regulator (5);
- Hose of mixture of air of the case of a regulator (6);
- Hose of purge of a tube in meeting of the valve of the EVAP (7) system;
- Two hoses of vacuum of the camera of vacuum of the ACIS (8) system;
- Collar of electrical system of motor of meeting of the valve of the EVAP (9) system.
The connections that are subject to the desmontagem
- Withdraw a hook that lifts n ° 1 of the motor and a torture of the air distributor.
- Result two pins, two nuts and remove the air distributor together with the placing.
- Separate the next connections:
- Taken of injectors (n ° 25);
- The hose of fuel of offer of a tube (n ° 18) (they follow rules of security of the work with the fuel system);
- Hose of heater of the oil pipeline of entry (n ° 22).
|
-
Turn 9 pins and two nuts in the sequence, the shown return, withdraw two lavadores. Distributive roads and meeting of injectors withdraws the oil pipeline of entry, fuel.
|
- Taken Desconecte (8 and 20) and the best hose of an electric heater (23) then result two pins and two nuts of a tube of useless branch of water (29), withdraw two lavadores, desconectam perepuskny a hose (15) and withdraw a tube of useless branch of water with two placing (11).
- Withdraw rolls of the ignition and a capture of spark (there sees the Check of Section e a substitution of captures of spark).
- Drive takes away a belt of GRM, the cog-wheels of the axles and top (n ° 2) an intermediary roll (there see the Removal of Section, check and installation of a belt of GRM drive of his natyazhitel, pulley and cog-wheel of an end of inclination, cog-wheels of axles and intermediary rolls).
- There launches a braid of electrical system of motor of three clips in a covering n ° 3 of a belt of GRM drive (n ° 10), result 6 pins of the fixation of a covering and withdraw it.
|
|
Component of installation of final collectors, sensors and electrical system
|
- CMP withdraws (9) sensors and valves of the management of GRM (5) lubricating.
- Give the fixation and desconecte the protection of an electrical system of the motor against the back, the right and left parties of the head of cylinders.
|
Fixation of braid of electrical system in the rear party of a head of cylinders |
|
Fixation of braid of electrical system in a head of the right number of cylinders |
|
Fixation of braid of electrical system in a head of the left number of cylinders |
- Result two pins and withdraw a rear plate (n ° 6) of the left head of cylinders.
- A pin results and desconecte the tube of offer (n ° 13) of a tube of branch of reception. Withdraw a ring of fighter.
- Result three pins and withdraw an arm of the bomb GUR (n ° 8).
- Desconecte an electrical system of the sensor of the quality of the mixture of air fuel (the sensor 1 of the line 1) of a final collector of the right number of cylinders, withdraws a torture of a collector (n ° 3) and, having given 6 nuts, remove a collector (n ° 2).
-
Withdraw the catalytic converter (n ° 20 in an illustration the Component ones that are subject to the removal of the access the GRM drive).
- Desconecte an electrical system of the sensor of the quality of the mixture of air fuel (the sensor 1 of the line 2) of a final collector of the left number of cylinders, withdraws a torture of a collector (n ° 15) and, having given 6 nuts, remove a collector (n ° 16).
- There results a pin of the fixation of a guide of the probe of the level of oil of reason (n ° 14) and a guide spreads out together with the probe and a ring of fighter of the trundle bed of case.
- Result 9 pins of the fixation of coverings (1 and 13) leaders of cylinders (25 and 26) and discover together with the placing.
|
|
Component of meeting of a head of cylinders
|
- Withdraw the axle of entry of the right number of cylinders. With this finality:
|
-
Combine etiquettes of agreement (in two points; in end of the left number of cylinders – in a point) in wheels of gear of entry and final end, when they are turned by a key of adjustable screw of a lyska in end to an end.
|
- Fix between them the main and additional wheels of gear of the final axle with a pin of M6-1.0X16 (20), through that having registered a spring of wheel of gear.
|
-
In stages one weaken and result 10 pins of the fixation of coverings of loads of the axle.
|
- Withdraw 5 coverings of loads and the axle.
|
-
In stages one weaken and result 10 pins of the fixation of coverings of loads of the final axle of the right number of cylinders. Withdraw 5 coverings of loads and the axle.
|
- Withdraw entry and axles soon final of the left number of cylinders, working similar to the removal of the end of the right number of cylinders.
- The retired end and the coverings of his loads arrange according to his agreement situation this in the meeting to install them at ancient places.
- Constantly I embarrass in a few final vice-axles of lysk below a pull and end of type. With this finality:
- Through the special adaptation they spin a wheel of additional gear in reverse sense to the movement of the pointers of the clock and result the pin that fixes it around main gear.
- Hold tight claws a ring of lock that cuts (n ° 16) and withdraw it.
- Withdraw an undulating lavador (14), a wheel of additional gear (17) and a spring of a wheel of gear (15).
|
Do not mix the retired parts of final axles of the left and right number of cylinders. |
- Remove leaders of cylinders. With this finality:
- A key of six sides turns prutkovy in 8 mm the corresponding extreme pin of the fixation of each head of cylinders.
|
-
Exactly, in stages one weaken and turn 8 pins of the fixation of each head of cylinders strictly in the sequence. Withdraw 16 pins with lavadores.
|
|
-
Remove leaders of cylinders of hair clips of hair of the cylinder block and put them in wooden grindstones not to damage the inter-connected surfaces. If it is not possible to remove leaders of cylinders manually, exactly hooks them up the screwdriver, trying not to damage the inter-connected surfaces of heads and the cylinder block.
|
|
|
Desmontagem
|
Do not withdraw a rotor of the installation of phases GRM (VVT-i) of the axle if it is not supposed that it substitutes a rotor or an end. |
|
- Withdraw empurradores of lavadores of agreement and valves. His agreement so that then they it was possible to establish at ancient places.
- Withdraw valves. With this finality:
- Hold tight one spring valvate and withdraw fine cookies of cutting locks.
- Withdraw a few springs of plate, one spring and the valve.
- Pull out claws maslootrazhatelny hats.
- Through the compressed air and a magneto they withdraw a spring saddle.
- The agreement the component ones withdrawn so that then they it was possible to establish at ancient places.
- Result 6 pins and withdraw a rear cape of a head of cylinders and his placing (n ° 23).
|
-
A cork results and withdraw the filter of the valve of the system VVT-i and his placing.
|
|
-
Armband in a vice the axle of lysk below a key of six sides, gives to a face key 46 mm for nut of the fixation of a rotor of VVT-i and withdraw a rotor, if necessary when the hammer knocked down it with the gentle living creature.
|
|
|
|
The nut has the left woodcarving. |
|
Do not result three pins of a rotor. |
To check
|
- There compensate for a gentle scraper the superior surfaces of pistons of deposits from coal, compensate for the inter-connected surfaces of the cylinder block and leaders of the cylinders of the placing then the punch remains the dirt remains the compressed air and the oil of punch of sculpting openings below pins of the leaders' fixation of cylinders.
- Compensate for a brush of wire of the camera of combustion of deposits from coal then cylinders leaders do the dish a gentle brush with the solvent.
- Through the rifle small rod they compensate for the captures of direction of valves. Clear leaders of valves of deposits from coal valves then clear a gentle brush.
- Through an equal flat sovereign they measure not planeness of leaders' surfaces of the inter-connected cylinders to the cylinder block. If necessary a head of cylinders substitutes.
- Measure the internal diameter of the captures of direction of valves, the diameter of nucleuses of valves (in several sections) then they calculate a slit of oil. Compare all the data obtained with demands of Specifications of the Chief Dvigatel, if necessary a guide substitutes to capture and / or the valve.
- Measure a corner of facet of valve, the height of a consolation of a chief of Kapan, the length full of the valve and check the superior surface of a nucleus of the valve of the use. Compare all the data obtained with demands of Specifications of the Chief Dvigatel, if necessary the valve substitutes or grind the superior surface of a nucleus (but not less than what to the least admissible length of a nucleus!).
|
-
Perforate saddles of valves in an angle the 45th hail. also check concentricity of saddles of valves and facets of valves, and also width of his interface. If necessary a valve saddle perforates.
|
- Supporting valvate springs against a metal corner, vertical will measure the size of detour of face of spring end of. It will measure the spring length in a free state then they measure a spring tension in the moment of the compression he to the 33,8 mm length. Compare all the data obtained with demands of Specifications of the Chief Dvigatel, if necessary it substitutes springs valvate.
- It will measure a radial thrashing of the central neck and the diameter of necks of each axle. Measure height of cames and a play of axial side of axles. Compare all the data obtained with demands of Specifications of the Chief Dvigatel, if necessary the axle substitutes or check a slit of oil of his loads.
- Check loads of axles of the existence of flakings and carve. If necessary there substitutes coverings of loads and a head of joined cylinders.
- The clear necks of a covering of loads of axles then measure a slit of oil of loads through the play of Plastigage, when held tight pins of the fixation of coverings of loads with the effort of 16 nanômetros. Compare the data obtained with demands of Specifications of the Chief Dvigatel and if necessary there substitutes the axle and / or the coverings of the loads and a head of joined cylinders.
- Install axles without the wheel of additional gear of the final axle and measure the dead course of wheels of gear. If the measured value does not satisfy conditions of Specifications of the Chief Dvigatel, substitute axles.
- Size of slit of measure in a spring ring of a wheel of gear of the axle. If the measured value does not satisfy conditions of Specifications of the Chief Dvigatel, substitute one spring.
- The diameter of measure of an in favor point below a valve empurrador, the diameter of the empurrador and they calculate a slit of oil of an empurrador. Compare the data obtained with demands of Specifications of the Chief Dvigatel and if necessary there substitutes an empurrador and / or a head of cylinders.
- Through an equal flat sovereign they measure not planeness of the inter-connected surfaces of the air distributor, both inter-connected surfaces of the oil pipeline of entry and the inter-connected surface of final collectors. Compare the data obtained with demands of Specifications of the Chief Dvigatel and if necessary it substitutes the component correspondents.
- Diameter of measure of a part of tension of pins of fixation of a head of cylinders with heads below a key hexagon prutkovy. Compare the data obtained with demands of Specifications of the Chief Dvigatel and if necessary it substitutes pins.
|
|
Meeting and installation
|
Before initial meeting and installation, one secures of the purity of all the component ones. |
|
|
-
If the rotor VVT-i was withdrawn, establish it. With this finality combine a pin in the distributive one to an end with a groove in a rotor, an end puts a rotor and hold tight a nut of the fixation of a rotor with the effort of 150 nanômetros, previously having lubricated a reason of woodcarving.
|
- During the installation of a new head of cylinders it must install captures of captures of spark and a tube of the system PCV. The captures of fat of the captures of spark before the installation with the fixation selante (for example, to Three Obligation 1324) and it presses, having left to influence 42,4 43,4 mm ÷ on a surface of agreement of a covering of the load of the axle. Tubes of hammer of PCV with the hammer through wooden placing aflush with the inter-connected surface of a head of cylinders.
|
Installation of the capture of a capture of spark |
|
Installation of a tube of PCV |
- Install the filter of valve VVT-i together with the placing (to see n ° 22) and holds tight a cork of filter with the effort of 45 nanômetros.
- Establish a rear cape of a head of cylinders (to see n ° 23) and holds tight pins of his fixation with the effort of 10 nanômetros.
- Install valves in the sequence, the sequence of return of his removal.
|
The hats of Maslootrazhatelny of valves of entry have the brown color and the end - ash. |
- Establish empurradores of lavadores of agreement and valves. It is secured what the empurradores lisamente spin to the hand in the landing nests.
- Two installs in the cylinder block leaders' placing of cylinders according to the good pointed in the placing (L – left, R – straight). Establish leaders of cylinders.
- Constantly like debit was, the return specified illustrations, one holds tight 8 pins of the fixation of each head of cylinders (with heads of 12 faces) with the effort of 54 nanômetros then they are seized in the same sequence in a corner the 90th hail.
|
Before corseting itself of pins they polish his woodcarving and the lowest part of heads with a fine layer of oil of reason. |
- Hold tight pins of the leaders' fixation of cylinders with heads below a key prutkovy with the effort of 18 nanômetros.
|
Before corseting itself of pins they polish his woodcarving and the lowest part of heads with a fine layer of oil of reason. |
- Put a spring of a wheel of additional gear, a wheel of gear and an undulating lavador then they register his ring of spring lock (number n ° 14-17) final axles.
- Spinning a wheel of additional gear in the direction of the movement of the pointers of the clock through the special adaptation, combine openings in the main and additional gear wheels and temporarily screw in them an auxiliary pin. The level teeths of the main and additional gear wheels and it holds tight a pin.
|
-
The necks of fat of final axles with the oil of fresh reason and they put us in a head of cylinders, having developed etiquettes adjust in a corner the 90th hail. of the front airplane.
|
|
-
The fat with lubricating fighter edges universal again epiploon advanced and it installs it in the axle.
|
|
-
The clear loads coverings n ° 1 of axles of the old material of in favor freemasonry and they apply the new selante (n ° 08826-0080 of the catalog Toyota/Lexus).
|
- Establish coverings of loads of final axles at his ancient places and with the ancient direction.
|
The etiquettes of the type of E1 in loads coverings indicate the number of the load of a final end, which reads in GRM drive. The arrow near to an etiquette specifies towards GRM. The fat with a fine layer of oil of reason a woodcarving and the lowest part of leaders of the pins of the fixation of coverings of loads and exactly it holds tight pins with the effort of 16 nanômetros. |
|
-
The necks of fat of the axles of entry with the oil of fresh reason, combine etiquettes of agreement in the leader and driven gear wheels and put axles of entry in a head of cylinders.
|
- Establish coverings of loads of axles of entry at his ancient places and with the ancient direction.
|
The etiquettes of the type of I1 in loads coverings indicate the number of the load of an end of entry, which reads in GRM drive. The arrow near to an etiquette specifies towards GRM. The fat with a fine layer of oil of reason a woodcarving and the lowest part of leaders of the pins of the fixation of coverings of loads and exactly, in stages, it holds tight pins with the effort of 16 nanômetros. |
- There results an auxiliary pin of wheels of gear of the final axle.
- Check and if necessary agreement a slit valvate (to see the Check of Section e o adjusts of slits valvate).
|
-
Establish traffic jams of traffic of segment (n ° 24), previously when old fighter material compensated for them and having to put new (n ° 08826-0080 of the catalog Toyota/Lexus).
|
|
- Apply the selante (n ° 08826-0080 of the catalog Toyota/Lexus) in leaders' cylinders coverings. Put in leaders of the cylinders of the placing and establish leaders' coverings of cylinders, having held tight his pins exactly and in stages with the effort of 8 nanômetros.
|
- Install the next component ones, holding tight his fixation with the necessary efforts:
- Final collector of the right number of cylinders and his torture;
- Pump the arm GUR;
- The probe of level of oil of reason together with his guide;
- Final collector of the left number of cylinders and his torture;
- Catalytic converter;
- The tube of system of cooling of offer;
- Subsequent plate of a head of cylinders;
- Protection of an electrical system of the motor;
- Valves of VVT-i;
- Sensors of CKP.
|
Use new rings of fighter of a guide of the probe of the level of oil of reason and the tube of system of cooling of offer. |
|
-
There examines the placing of a covering n ° 3 of a belt of GRM drive. If the entirety of the placing is broken, substitute it, previously having withdrawn all the aspects of the old placing and having compensated for a surface of covering. Withdraw a protective movie or paper of the new placing, establish the placing exactly in an outline, and strongly hold tight the placing to a covering. One secures that the placing supported a covering.
|
- There establishes a covering n ° 3 of a belt of GRM drive and hold tight 6 pins of his fixation with the effort of 8,5 nanômetros.
- Drive establishes a roll of belt of GRM n ° 2, the cog-wheels of the axles and a belt of GRM drive (there see the Removal of Section, check and installation of a belt of GRM drive of his natyazhitel, pulley and cog-wheel of an end of inclination, cog-wheels of axles and intermediary rolls).
- Establish when they were taken of spark and rolls of the ignition (seen the Check of Section e a substitution of captures of spark).
- Two establishes new placing of a tube of useless branch of water (n ° 29), join perepuskny a hose, hold tight the fixation of tube of branch with the effort of 15 nanômetros and there adheres an electrical system of sensor of ECT, the capture of the tire of the base and a hose of an electric heater to a branch tube.
- The distributive roads install the oil pipeline of entry, fuel and the injectors then exactly hold tight 9 pins and 2 nuts of the fixation of the oil pipeline of entry with the effort of 15 nanômetros.
- Adhere to hose of offer of fuel to a tube and a hose of heater to the entry oil pipeline.
- One secures that the fixation of a tube of useless branch of water corsets itself with the effort of 15 nanômetros.
- Establish the meeting of the air distributor. Hold tight the whole fixation with the necessary efforts. Use the new placing of the air distributor.
- Install the described component ones.
- Fill the system of cooling, the motor begins and check it holes. Execute a travel of proof during which it checks if they secure of the lack of strange noises and pushes. One secures of fairness of the dislocation of gear and smoothness of the course of the car.
- Check the level OZh and if necessary it modifies it (to see the Substitution of Section of Cooling Liquid (CL)).
|
|
|
|